Wooden Winter Olympics Model Room-manufacture,factory,supplier from China

(Total 24 Products for Wooden Winter Olympics Model Room)
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contacter maintenant
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contacter maintenant
InstructionCentral heating, iron and steel enterprises and thermal power plants in urban winter are large-scale coal-fired production, which has become the source of air pollution. In recent years, all localities have adopted active environmental protection policies.
  Contacter maintenant
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contacter maintenant
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contacter maintenant
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contacter maintenant
Benefits of Interarch steel framing for Educational Buildings1.Flexibility in construction and aesthetic look2.Large grid span as per class room requirement.3.Low lifetime maintenance cost and durability.4.Easily expandable for growing need with the time.5.Faster construction resulting early occupancy.
  Contacter maintenant
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contacter maintenant
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contacter maintenant
TypesSome common types of steel buildings are "straight-walled" and "arch," or Nissen or Quonset hut. Further, the structural type may be classed as clear span or multiple span. A clear span building does not have structural supports (e.g. columns) in the interior occupied space.Straight-walled and arch type refer to the outside shape of the building. More generally, these are both structural arch forms if they rely on a rigid frame structure.
  Contacter maintenant
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
  Contacter maintenant
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contacter maintenant
Steel structure bridge is a form of bridge, refers to a bridge top knot important load bearing capacity part is made of stainless steel profiles. The steel structure bridge is the same as the bridge, which is above the height of rivers, lakes and sea bottom cut barriers. The middle long-span bridge is more likely to see prestressed steel concrete bridge and steel structure bridge. The structure of a steel structure bridge consists of a main bridge along its longitudinal direction.
  Contacter maintenant
The picture is the steel structure bridge components produced in our factory.
  Contacter maintenant
   A steel truss for houses began to appear in the last 4-5 years. Previously, conventional steel material had been widely used, but for industrial construction.   A conventional steel structure is known for strong and has high durability. This structure allows the building to be made with a wide span. The steel used for construction is generally I-shaped and tied each other using the dynabolt system.    The original steel material is black. The color of steel sold on the market is generally given further treatment.
  Contacter maintenant
Basic InstructionYu biying, member of the mission team of beijing college of technology and deputy director of the energy and environmental policy studies center of beijing college of technology, added to the media, "we've got established intelligent monitoring device at dozens of points consisting of the grandstand region of the venue, power eating system and target audience front to acquire human-gadget and physical environment data consisting of carbon dioxide attention, waft of human beings, electricity, temperature and humidity of the venue in actual time.
  Contacter maintenant
In simple terms, steel structure is actually a kind of structure composed of different steel materials through a certain connection. Mixing different types of materials can effectively improve the overall performance of steel structure. With the continuous progress of science and technology, steel structure has been widely used in engineering projects, so as to effectively display its performance advantages. For example, high-rise buildings make full use of the characteristics of strong steel structure to effectively improve the quality of construction engineering.
  Contacter maintenant
Basic InstructionWe have a sound system of qualifications, the existing steel structure engineering contracting qualification (Level I), steel structure manufacturing and installation qualification (Level I), light steel structure engineering design qualification (Grade A), mechanical and electrical construction general contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in total with 20 qualifications.Steel construction projectAustralia steel bridgeTanzania steel bridge
  Contacter maintenant
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contacter maintenant
Domestic steel structure stations, including railway stations, bus stations.
  Contacter maintenant
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contacter maintenant
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contacter maintenant
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contacter maintenant
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contacter maintenant
Relate News
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
From August 10 to 12, 2021, representatives of African Development Bank, Tanzania Ministry of Finance, BRT Authority of Tanzania Economic capital And Tanzania Highway Authority, owner of the project, visited the BRT-2 Phase 1 project of Tanzania for a three-day evaluation and inspection. The investigation team inspected the construction of the bridge, asphalt concrete pavement and bus station under construction, and listened to the detailed report of the project leader on the progress of the project and the difficulties faced at present.
    In November, the group signed the first phase of the BRT station project in dar es Salaam, Tanzania, which will become another bright spot in the international trade of the Group after its completion.    The group will take this as an opportunity to strengthen foreign exchanges and cooperation, actively docking the international trade market, fully open the domestic and foreign "double good" situation, for the realization of the group "double hundred goals" to create a new trend!
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
Sheikh Abdullah Al Salem Cultural Centre (ASCC) is a new world-class museum district within Kuwait City. Together with the Sheikh Jaber Al Ahmad Cultural Centre (JACC), and recently restored Al Salam Palace, also SSH projects, it will form Kuwait’s new national cultural district,GuoShun Group supply the Main steel structure,SSH as general contractor.The museums are a celebration of Kuwaiti, Islamic and Arab culture and history.
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
Recently, Mr. Shen Meng and Mr. Chen Weiming from the energy and environmental policy research center of Beijing University of technology led members of the project team to visit Guoshun group for investigation. Feng Chao, deputy general manager of Guoshun group, and Wang Zhongcai, director of the comprehensive Department of Guoshun green construction, accompanied the investigation.The project team went to the "integrated development of primary, secondary and tertiary industries" zero carbon demonstration park being built by Guoshun group for on-the-spot investigation.