Prefabricated Steel Structure Ppt-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Steel Structure Ppt)
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contacter maintenant
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contacter maintenant
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contacter maintenant
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contacter maintenant
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contacter maintenant
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contacter maintenant
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contacter maintenant
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contacter maintenant
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contacter maintenant
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contacter maintenant
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contacter maintenant
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contacter maintenant
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contacter maintenant
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contacter maintenant
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contacter maintenant
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contacter maintenant
   A steel truss for houses began to appear in the last 4-5 years. Previously, conventional steel material had been widely used, but for industrial construction.   A conventional steel structure is known for strong and has high durability. This structure allows the building to be made with a wide span. The steel used for construction is generally I-shaped and tied each other using the dynabolt system.    The original steel material is black. The color of steel sold on the market is generally given further treatment.
  Contacter maintenant
Basic InstructionWe fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon. After the optimization and innovation node, the connection method and production process are easy to control the quality of technology.Steel construction projectSteel projects in China
  Contacter maintenant
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contacter maintenant
Steel structure bridge is a form of bridge, refers to a bridge top knot important load bearing capacity part is made of stainless steel profiles. The steel structure bridge is the same as the bridge, which is above the height of rivers, lakes and sea bottom cut barriers. The middle long-span bridge is more likely to see prestressed steel concrete bridge and steel structure bridge. The structure of a steel structure bridge consists of a main bridge along its longitudinal direction.
  Contacter maintenant
Basic InstructionWe have a sound system of qualifications, the existing steel structure engineering contracting qualification (Level I), steel structure manufacturing and installation qualification (Level I), light steel structure engineering design qualification (Grade A), mechanical and electrical construction general contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in total with 20 qualifications.Steel construction projectAustralia steel bridgeTanzania steel bridge
  Contacter maintenant
In simple terms, steel structure is actually a kind of structure composed of different steel materials through a certain connection. Mixing different types of materials can effectively improve the overall performance of steel structure. With the continuous progress of science and technology, steel structure has been widely used in engineering projects, so as to effectively display its performance advantages. For example, high-rise buildings make full use of the characteristics of strong steel structure to effectively improve the quality of construction engineering.
  Contacter maintenant
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contacter maintenant
Relate News
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
Aeronautics – aircrafts won’t be whole with out its structural metal additives.Car – automobile producers also count metallic as an important material.Creation – the best call for for structural steel comes from the development industry.
1. The portal body structure is a form of a closed structural system. it has a simple pressure, clean force transmission course, and fast creation pace. the introduction of a portal frame shape strengthens the bonding homes of partitions and generates extra flexible area layouts, as a consequence offering extra opportunities for engineering creativity.2. Metallic constructing body structures are used to assemble excessive-upward push and superb excessive-upward push buildings, multi-tale homes, and business office homes. with the power of its shape.