Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
Contacter maintenant
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contacter maintenant
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contacter maintenant
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contacter maintenant
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
Contacter maintenant
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
Contacter maintenant
InstructionFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
Contacter maintenant
IntroduceFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
Contacter maintenant
InstructionImportant heating, iron and metal companies and thermal power plants in city iciness are large-scale coal-fired production, which has grow to be the supply of air pollutants. in latest years, all localities have adopted active environmental protection guidelines.
Contacter maintenant
InstructionCentral heating, iron and metal organizations and thermal electricity flowers in urban wintry weather are large-scale coal-fired production, which has grow to be the supply of air pollution. in recent years, all localities have followed active environmental safety policies.
Contacter maintenant
InstructionPrimary heating, iron and metallic groups and thermal strength plant life in city wintry weather are large-scale coal-fired manufacturing, which has come to be the supply of air pollutants. in latest years, all localities have followed lively environmental protection guidelines.
Contacter maintenant
The high content of molybdenum, chromium and nitrogen make unss31254 have excellent resistance to pitting corrosion and crevice corrosion. The addition of copper improves the corrosion resistance in some acids. In addition, unss31254 has good stress corrosion cracking resistance due to its high nickel content and high chromium and molybdenum content.S31254 is an alloy material with corrosion resistance. Its density is 8.0g/cm3 and its melting point is 1320-1390 ℃. The carbon content of unss31254 is very low, which means that the risk of carbide precipitation due to heating is very small.
Contacter maintenant
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
Contacter maintenant
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
Contacter maintenant
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
Contacter maintenant
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
Contacter maintenant
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
Contacter maintenant
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
Contacter maintenant
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
Contacter maintenant
Basic InstructionThe bridge has a total duration of 111 meters and a span of five meters,forty-4 meters of it had been blown up all through the preventing.
Contacter maintenant
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
Contacter maintenant
Basic InstructionThe complete procedure supervision and inspection of the assignment was finished by the worldwide famous bureau veritas. the layout, manufacturing and full meeting offerings of guoshun institution have been evaluated as "very satisfied" via the owner icafal ingenier í a y constructi ó n s.a. (the sixth biggest wellknown contractor in chile and rated as the countrywide champion of chilean construction sustainable development employer by using the chilean house of representatives).Site Display
Contacter maintenant
Basic InstructionThe bridge has a total length of 111 meters and a span of 5 meters,Forty-four meters of it were blown up during the fighting.
Contacter maintenant